New Main Stand


Page 18 of 21 < 14 15 16 17 18 19 20 21 >
Yellow Card - User has been warned of conduct on the messageboards Hrolf The Ganger Flag 03 Jun 24 2.51pm

Originally posted by Badger11

I heard a rumour that one of the builders bidding has now pulled out of the UK. I heard a second rumour that work is due to start in September which makes sense.

Assuming we did not sign contracts until we were safe from relegation the builders will require notice to hire staff, sub contracters and order materials. So September would make sense.

Just a rumour.

That sounds plausable, however Parish said the stand woud go ahead relegation or not.
Let's hope that September is the longest we have to wait. Palace fans deserve a better ground sooner rather than later. It's been a long time since Noades did the Holmesdale.

Edited by Hrolf The Ganger (03 Jun 2024 2.52pm)

 

Palace in the Blood Flag 03 Jun 24 3.32pm

Originally posted by Hrolf The Ganger

I'm only worrying out loud, but I hope this lack of announcement on the stand doesn't mean that they are holding it back to counter any bad news about player sales, or simply because they need some cash from them to go ahead.

Are there still any reasons why this thing can't get built now?

The situation with Textor will have an effect in my view. He will be unwilling to loan or underwrite loans on a personal basis if he is selling. This will also have an effect to an extent on incoming transfers too. He has in past been more interested in football side of things with other 2 Americans more interested in infrastructure. I suspect that Glasner has been made promises on recruitment and that the transfer budget may now receive priority over infrastructure until Textor situation resolved possibly by other 2 loaning or underwriting the commercial loans.

 

Yellow Card - User has been warned of conduct on the messageboards Hrolf The Ganger Flag 03 Jun 24 3.50pm

Originally posted by Palace in the Blood

The situation with Textor will have an effect in my view. He will be unwilling to loan or underwrite loans on a personal basis if he is selling. This will also have an effect to an extent on incoming transfers too. He has in past been more interested in football side of things with other 2 Americans more interested in infrastructure. I suspect that Glasner has been made promises on recruitment and that the transfer budget may now receive priority over infrastructure until Textor situation resolved possibly by other 2 loaning or underwriting the commercial loans.

Why would Textor make the club look less appealing if he wants to sell his shares?
Surely the construction of a new stand containing the hub of corperate facilities would be a good look.

Would he make life difficult?

I suppose it woulds be in both parties interests if Textor was to get out sooner. That would make he and the club less likely to make any negative noises around the current situation.
From a fan point of view, communication of facts is prefered, but it might not make good business sense to be pointing fingers right now.

 

Palace in the Blood Flag 03 Jun 24 6.29pm

Originally posted by Hrolf The Ganger

Why would Textor make the club look less appealing if he wants to sell his shares?
Surely the construction of a new stand containing the hub of corperate facilities would be a good look.

Would he make life difficult?

I suppose it woulds be in both parties interests if Textor was to get out sooner. That would make he and the club less likely to make any negative noises around the current situation.
From a fan point of view, communication of facts is prefered, but it might not make good business sense to be pointing fingers right now.

He will not want to put any money in and will want his loans repaid when he sells. It will make no difference to price of his shares if it has started or not. Planning permission has been granted and that will help his price. If the rest of the shareholders want to start without him that is fine I just don't think they will. I don't think he will make life difficult but if he is buying Everton he can not currently have interest in both clubs. They need money urgently so press are reporting he is asking for permission to start process while shares in Palace are sold. If EPL agree then he must not be part of decision making processes at Palace in interim in particular infrastructure projects and transfers I wonder if current Everton owner may be willing to buy his Palace shares so Everton processes can start. His interest and ours is that if he is going the quicker it happens the better


Edited by Palace in the Blood (03 Jun 2024 6.33pm)

 

Yellow Card - User has been warned of conduct on the messageboards Hrolf The Ganger Flag 03 Jun 24 8.45pm

Originally posted by Palace in the Blood

He will not want to put any money in and will want his loans repaid when he sells. It will make no difference to price of his shares if it has started or not. Planning permission has been granted and that will help his price. If the rest of the shareholders want to start without him that is fine I just don't think they will. I don't think he will make life difficult but if he is buying Everton he can not currently have interest in both clubs. They need money urgently so press are reporting he is asking for permission to start process while shares in Palace are sold. If EPL agree then he must not be part of decision making processes at Palace in interim in particular infrastructure projects and transfers I wonder if current Everton owner may be willing to buy his Palace shares so Everton processes can start. His interest and ours is that if he is going the quicker it happens the better


Edited by Palace in the Blood (03 Jun 2024 6.33pm)

Food for thought.

It would be good to hear from someone who has some inside information so we might know if the Textor situation is impacting on the timetable.

 

doombear Flag Too far from Selhurst Park 14 Jun 24 9.33am

According to The Athletic, preliminary work has started in preparation for the new stand. This work involves:

1. Temporary buildings housing the Away dressing room and offices are in the process of being dismantled.

2. "The away dressing rooms will move to underneath the Holmesdale, where £1million (.3m) is being spent on water retention tanks to drain water away from the flooded basement"

3. Space under another tier of the Holmesdale could well be used as a car park given that the existing car park will disappear when building work starts later this year. Part of that space will also house a new kitchen.

4. New offices being relocated to back of Whitehorse Lane stand where Crystals Nightclub was.

Edited by doombear (14 Jun 2024 9.33am)

 

joe_cpfc Flag Basingstoke 14 Jun 24 10.16pm

It's happening.

[Link]

[Link]

Edited by joe_cpfc (14 Jun 2024 10.17pm)

 

Yellow Card - User has been warned of conduct on the messageboards Hrolf The Ganger Flag 15 Jun 24 12.14am

The housing situation needs sorting but this is encouraging.

Should be great.

 

Davepalace707 Flag Northumberland 15 Jun 24 8.17am

Originally posted by joe_cpfc

It's happening.

[Link]

[Link]

Edited by joe_cpfc (14 Jun 2024 10.17pm)

They seem to have forgotten the floodlights

 

BritofQatar Flag Manchester 15 Jun 24 8.17am

Lads, I rarely post on the site, more of a daily observer of everyone else's great posts but felt the need on this occasion to drop a post.

From my perspective I wouldn't worry at all about the process of the main stand on how long it's taking etc. As a qualified architect and having worked on a few stadiums globally, the process for these types of buildings are so difficult on several levels from planning to the construction complexities of the site specifics. Given selhurst park is bang in London in a dense urban environment will only add to the long drawn out process to make sure we have complied with all pre start conditions and there's also the added complexity of finding the right tier 1 main contractor for the job which is a limited pool in the UK.

In the background I'm pretty sure it'd been chugging along daily with developed drawing material in the background and various discharges of planning conditions. I could be wrong but for me there's nothing that's come to light which I thought would be a non startedr to the project.

From what I've read/heard my undestanding it was kicking off around September this year. Hopefully 2026 season we should see tenstand in all it's glory (par no major delays once site works commence!) Which should align nicely then we start are road to European glory &#128521; COYP!

Edited by BritofQatar (15 Jun 2024 8.20am)

 

BritofQatar Flag Manchester 15 Jun 24 8.19am

Originally posted by BritofQatar

Lads, I rarely post on the site, more of a daily observer of everyone else's great posts but felt the need on this occasion to drop a post.

From my perspective I wouldn't worry at all about the process of the main stand on how long it's taking etc. As a qualified architect and having worked on a few stadiums globally, the process for these types of buildings are so difficult on several levels from planning to the construction complexities of the site specifics. Given selhurst park is bang in London in a dense urban environment will only add to the long drawn out process to make sure we have complied with all pre start conditions and there's also the added complexity of finding the right tier 1 main contractor for the job which is a limited pool in the UK.

In the background I'm pretty sure it'd been chugging along daily with developed drawing material in the background and various discharges of planning conditions. I could be wrong but for me there's nothing that's come to light which I thought would be a non startedr to the project.

From what I've read/heard my undestanding it was kicking off around September this year. Hopefully 2026 season we should see tenstand in all it's glory (par no major delays once site works commence!) Which should align nicely then we start are road to European glory &#128521; COYP!

 

PJEagle Flag London 15 Jun 24 8.43am

B cause of ill health I haven't been able to gone SP for ages, but to sit in the new stand once completed will be brilliant and definitely something on my list of things to do and enjoy

 

Palace Old Geezer Flag Midhurst 15 Jun 24 11.48am

Originally posted by PJEagle

B cause of ill health I haven't been able to gone SP for ages, but to sit in the new stand once completed will be brilliant and definitely something on my list of things to do and enjoy

Yep, me too PJ, haven't been since 2018, but I must say this new look stadium is stunning, well certainly when compared with the existing stand. I just hope I'm still around to see it finished, even if only on TV.

 


Dad and I watched games standing on the muddy slope of the Holmesdale Road end. He cheered and I rattled.

ex hibitionist Flag Hastings 15 Jun 24 12.39pm

"Preliminary building projects relating to the first stages of construction are underway". Wow that's a relief, hooray!!! We still haven't bought those six houses and we're looking for which supplier can sell us the concrete, glass and steel. This press release looks like it's been written by Grant Schapps, or another skilled BS artist. Hopefully they are genuinely reorganising the ground so they can start the building work - but that press release looks like a sop to us impatient fans, impatient to see the back of that cow shed we laughably call the main stand.

 

Yellow Card - User has been warned of conduct on the messageboards SW19 CPFC Flag Addiscombe West 17 Jun 24 2.40pm

Originally posted by ex hibitionist

"Preliminary building projects relating to the first stages of construction are underway". Wow that's a relief, hooray!!! We still haven't bought those six houses and we're looking for which supplier can sell us the concrete, glass and steel. This press release looks like it's been written by Grant Schapps, or another skilled BS artist. Hopefully they are genuinely reorganising the ground so they can start the building work - but that press release looks like a sop to us impatient fans, impatient to see the back of that cow shed we laughably call the main stand.

What

 


Did you know? 98.0000001% of people are morons.

ASCPFC Flag Pro-Cathedral/caravan park 17 Jun 24 2.56pm

It's been so quick that it's all a blur.

 


Red and Blue Army!

ex hibitionist Flag Hastings 17 Jun 24 3.31pm

Originally posted by SW19 CPFC

What

I'm not going to repeat myself, you'll have to read it again. Basically they've used big words to make it look like things have started when they haven't.

 

dreamwaverider Flag London 17 Jun 24 3.40pm

How are Fulham getting on. Theirs has been going for 4 seasons

 

Yellow Card - User has been warned of conduct on the messageboards SW19 CPFC Flag Addiscombe West 17 Jun 24 3.49pm

Originally posted by ex hibitionist

I'm not going to repeat myself, you'll have to read it again. Basically they've used big words to make it look like things have started when they haven't.

Righto.

 


Did you know? 98.0000001% of people are morons.

Badger11 Flag Beckenham 17 Jun 24 3.57pm

Originally posted by ex hibitionist

"Preliminary building projects relating to the first stages of construction are underway". Wow that's a relief, hooray!!! We still haven't bought those six houses and we're looking for which supplier can sell us the concrete, glass and steel. This press release looks like it's been written by Grant Schapps, or another skilled BS artist. Hopefully they are genuinely reorganising the ground so they can start the building work - but that press release looks like a sop to us impatient fans, impatient to see the back of that cow shed we laughably call the main stand.

Glad I wasn't the only one who thought this. As I understand it from the PR we have done some minor preliminary work to clear certain key areas however we do not yet have a builder or start date?

 


One more point